ENGVT Commissioning Services
![](Graphics/process-utility-commissioning-1.png)
The most energy efficient products and equipment available cannot ensure an energy efficient building. Digital Direct Control (DDC) systems are now almost mandatory to integrate this equipment to operate a building efficiently. The complexity of building control systems and modes of operation requires rigorous testing to ensure proper function. ENGVT has a track record of success in controls design that allows us to prepare extremely intelligent, thorough functional tests that verify the construction team has captured the “design intent”. A well-executed commissioning process helps ensure that the engineer’s projections are achieved and that the Owner will have an energy efficient, maintainable, functional building.